Select:
HISTORICAL CHURCHES:
{meniu_biserici_en}
1726 | The construction of the church begins on July 4th; |
1733 | The Transylvanian Bishop Gregor von Sorger consecrates the church on September 13th; |
1738 | The tower, 47 m high, is finished; |
1748 | The funeral monument of general Count Otto Ferdinand Traum of Abensberg is installed inside, on the South side; |
1777 | Anton Steinwald finishes the painting of Mary and Jesus child which decorates the main altar; |
1838 | The tower clock is installed; |
1860 | A new organ is bought from Karl Hesse in Viena; |
1901 | The church has stained glass windows made in Budapest and they are installed, three on each side of the nave; |
1904 | The German Ludwig Kandler paints the nave of the church; |
1910 | The church is illuminated for the first time with electricity on Christmas Eve; |
1916 | The church bells are confiscated and melt by the German army; |
1927 | The old turret on the ridge of the roof is replaced with a cross. Works take place in June; |
1931 | New bells are cast, installed and consecrated on March 29th; |
1971 | Church restauration works begin. They will last till 1975. The cross on the roof is replaced with a lantern tower; |
1978 | Restauration of the interior paiting; |
2007 | The funerary urns and caskets in the basement ossuary are moved to the cemetery. The basement is transformed into a cultural center; |